Omaha Driveway Sealing Call (402) 787-4097
Hazy light softens a smooth new asphalt driveway climbing to a buff brick ranch, a red double-drum roller resting on the grass

Omaha Driveway Sealing

(402) 787-4097

Free quotes for asphalt driveway paving in Omaha, NE.

Asphalt Driveway Paving in Omaha, NE

Asphalt paving builds a new driveway, or replaces a failed one, from the ground up: excavation, a compacted aggregate base and hot-mix asphalt rolled on top; around Omaha it is the right call once cracking covers most of the surface or the loess under the base has given way. HomeGuide's guidance for residential work is 6 to 8 inches of compacted gravel under 2 to 3 inches of asphalt, and 3 to 4 inches of asphalt for heavier use. Asphalt driveway installation is a job for a paving contractor with excavating and rolling equipment, not a sealing crew. Installed prices are on the cost page.

Typical Omaha price

$5 - $15 per sq ft installed; overlays $1 - $4 per sq ft · full pricing guide

The base is the part of a driveway nobody sees and everything depends on. The Monona-Ida silt under most of the city drains well, which helps, but silt is also the classic frost-susceptible soil, so the aggregate base has to spread wheel loads over it and keep water moving out. A paving contractor should explain how deep the excavation goes, what aggregate goes in, how it will be compacted and where water leaves the driveway. Monona soils occur on slopes up to 40 percent and Ida on slopes up to 60, so on sloped lots the edges and the downhill end deserve the closest attention.

Paperwork depends on the city. In Omaha, work that disturbs more than 250 square feet of street right-of-way falls under the stormwater program's linear underground project rules, with 48 hours' notice to Public Works and inlet protection. Papillion requires a Drive/Patio permit with a site plan and a public right-of-way permit for work there; La Vista requires a permit when any part of the approach is replaced or a curb cut or grind is needed; Bellevue exempts replacing a driveway no larger than the old one. Nebraska's one-call law requires notice at least two full business days before digging, and Iowa's requires 48 hours.

Hot-mix season follows the weather. Angi's guidance is that asphalt dries and cures most readily between 50 and 85 degrees and that late spring or early summer is the time to repave, which in Omaha points to May and June, ahead of July's 10.8 days at 90 degrees or above. Cars can usually use new asphalt after about three days. The first seal waits much longer: Angi says as little as 30 days but recommends three months, Fixr says roughly six months, and HomeGuide says a year. For a driveway paved in June, that usually means sealing the following summer.

Not every tired driveway needs a tear-out. HomeGuide's rule of thumb is to resurface a driveway less than 15 to 20 years old with less than 30 percent needing repair, adding a layer 1.5 to 2 inches thick, and to replace when cracks cover 60 percent or more or the driveway is 20 to 30 years old. An overlay follows whatever is underneath, including heaved sections and poor drainage, so the base has to be sound first. For ongoing care after paving, see asphalt maintenance plans.

Free quote

Fields marked * are required.

Fast response during business hours. No obligation.

Signs a driveway is past sealing

When several of these show up together, asphalt driveway installation is back on the table.

  • Cracks connect across most of the surface
  • Sections have heaved or sunk and hold water
  • Edges are crumbling along much of the length
  • Patches now cover a large share of the driveway
  • The driveway is 20 to 30 years old and has never been overlaid

Overlay, full replacement, or a new layout

The condition of the base and the plans for the lot decide the scope.

Overlay

A firm base with surface cracking and wear, less than 15 to 20 years old and under 30 percent needing repair. Patch the weak spots and add 1.5 to 2 inches of new asphalt.

Full replacement

Cracks over 60 percent of the surface, heaved or sunken sections, or a driveway past 20 to 30 years. Excavate, rebuild the base for frost-prone silt, and pave.

Widen or reroute

A new footprint, a wider apron or a second approach. Expect permits and right-of-way rules at the curb, and plan the drainage along with the pavement.

Questions

Asphalt Driveway Paving FAQs

How long should new asphalt wait before its first seal?

The published advice ranges from one month to a year. Angi says new asphalt can be sealed after 30 days but recommends waiting at least three months so the surface is not sealed while it is still releasing oils; Fixr says roughly six months; HomeGuide says after one year. Around Omaha the season decides it: a driveway paved in May or June is usually sealed the following summer, after one winter has shown whether any spot settles.

Is removing the old driveway priced separately from paving?

Often, and it is worth asking. Fixr puts removal of an old asphalt driveway at around $2 a square foot and a new driveway, grading and installation included, at $7 to $15 a square foot. HomeGuide's installed range is $5 to $12 or more. A bid that splits removal, base work and asphalt makes it easier to see whether the base is being rebuilt or just topped.

How thick should a new asphalt driveway be?

HomeGuide's guidance for residential driveways is 2 to 3 inches of asphalt over 6 to 8 inches of compacted gravel base, and 3 to 4 inches of asphalt where heavier vehicles such as trucks or campers will park. On silty loess that heaves when it freezes wet, the base depth and compaction matter as much as the asphalt thickness, and water has to have a way off the downhill end.

Free Asphalt Driveway Paving Quote — Omaha

Free quote

Fields marked * are required.

Fast response during business hours. No obligation.